保定电动门厂推荐:电动门,伸缩门,车牌识别等!
全国咨询热线:13313028229
当前位置:首页>>新闻资讯

白山电动伸缩门电控箱怎样安装?

时间:2023-04-24 15:13:10

电动伸缩门电控箱怎样安装?
How to install the electric telescopic door control box?
大家知道,电动伸缩门由多个部分组成,每个部分都有自己的作用,其中电控箱的安装也是有讲究的。下面为大家简单介绍下电动伸缩门电装箱的安装方法。
As we all know, electric retractable doors are composed of multiple parts, each of which has its own function, and the installation of the electric control box is also meticulous. Below is a brief introduction to the installation method of the electric telescopic door electric box.
1.根据要求,将十字准线放入锁箱与电控箱的螺孔中,用冲击钻打孔。锁工业电动伸缩门配件和电控箱应水平垂直安装,并用M6或M8螺栓固定牢固。
1. According to the requirements, place the crosshair into the screw holes of the lock box and electric control box, and use an impact drill to drill holes. The accessories and electric control box of the lock industrial electric telescopic door should be installed horizontally and vertically, and fixed firmly with M6 or M8 bolts.
2.接线管连接锁箱与电气柜。接线管两端的导线用专用螺母拧紧。若客户需要,可以用铜连接器连接。一般电线夹之间的间距小于100cm。
2. Connect the wiring duct to the lock box and electrical cabinet. Tighten the wires at both ends of the wiring duct with special nuts. If needed by the customer, copper connectors can be used for connection. The spacing between wire clips is generally less than 100cm.
3.安装电气控制板、限位器。
3. Install the electrical control board and limiter.
4.连接电气连接器,关闭电线、信号线、电源线等。接线标准应根据《低压用户电气设备管理条例》执行。金属软管中的两根电线用塑料管或(黄蜡管)包裹,接地线为双色线。尤其注意电动伸缩门接地线的牢固性。
4. Connect electrical connectors, turn off wires, signal lines, power lines, etc. The wiring standards should be implemented in accordance with the "Regulations on the Management of Electrical Equipment for Low Voltage Users". The two wires in the metal hose are wrapped in plastic tubes or (yellow wax tubes), and the grounding wire is a dual color wire. Pay special attention to the firmness of the grounding wire of the electric telescopic door.
5.打开电源,手动调纤维 驱鸟设备 保定通风管道 塑料土工格栅 检查井模具 流水槽模具 锻造厂家 华尔街铜牛整上下限,然后操作门几次,检查操作是否平稳。
5. Turn on the power, manually adjust the upper and lower limits, and then operate the door several times to check if the operation is smooth.